3j-Consult's expertise in industrial thermal engineering and heat networks make it an ideal partner for analysing the relevance of a cogeneration installation on industrial sites and for buildings in the tertiary sector.
To guarantee optimal cost-effectiveness, it is vital to calculate the optimal size of the 3j-Consult is approved by the Walloon Region within the framework of the Walloon Government decree of 30 May 2002 on grants for improving energy efficiency and promoting more rational use of energy in the private sector.
As such, we carry out feasibility studies for plant oil-fired or natural gas-fired cogeneration units.
To date, we have studied the integration of cogeneration units with capacity ranging The cogeneration pre-feasibility study assesses whether it is worthwhile to install a cogeneration unit in a given entity.
The feasibility study serves to calculate the size of the cogeneration unit and the storage tanks best suited to your buildings or processes, based on your net energy needs.